Dehumidification of Slops Tanks for Coating Renewal
Development of bespoke dehumidification system to allow on-station repair in zone 1 hazardous area
![](https://technical-limits.com/wp-content/uploads/2023/11/suncor-terra-nova-cs-header-768x306.jpg)
Quick Erect Access System
High speed turnaround of development of an access platform for stringer toe repairs on FPSO in Canada
![](https://technical-limits.com/wp-content/uploads/2023/10/bp-schiehallion-cs-header-768x306.jpg)
Water Ballast Tank Accelerated Repair Project
BP and MTL joined forces to achieve exceptional performance during a campaign to repair four pairs of water ballast tanks.
![](https://technical-limits.com/wp-content/uploads/2022/04/MicrosoftTeams-image-25-768x1024.jpg)
Terra Nova Life Extension Turnaround
Marine Technical Limits (MTL) is currently supporting its client Suncor and its Terra Nova FPSO as it undergoes a Life Extension Turnaround (LET) project in Navantia’s
![A naval architect and ROV pilot view live camera footage while carrying out an ROV water ballast tank inspection.](https://technical-limits.com/wp-content/uploads/2020/11/PA246661-Edit-e1604494052908-768x389.jpg)
ROV Water Ballast Tank Inspection
The industry faces significant challenges in the wake of COVID restrictions. There is a backlog of work to complete as a result of the deferral
![Hot Tap Image](https://technical-limits.com/wp-content/uploads/2020/10/P6192424-768x576.jpg)
Innovative Hot Tapping Hull Repair
On-station repairs to FPSO bilge keel and bilge plating while in production in harsh winter conditions.
![projects-team](https://technical-limits.com/wp-content/uploads/2020/09/Screenshot-2020-09-24-at-09.51.42-768x577.png)
Removal and Reinstatement of Pipe Stack