
Case Studies


Dehumidification of Slops Tanks for Coating Renewal
Development of bespoke dehumidification system to allow on-station repair in zone 1 hazardous area

Quick Erect Access System
High speed turnaround of development of an access platform for stringer toe repairs on FPSO in Canada

Water Ballast Tank Accelerated Repair Project
BP and MTL joined forces to achieve exceptional performance during a campaign to repair four pairs of water ballast tanks.

Terra Nova Life Extension Turnaround
Marine Technical Limits (MTL) is currently supporting its client Suncor and its Terra Nova FPSO as it undergoes a Life Extension Turnaround (LET) project in Navantia’s

ROV Water Ballast Tank Inspection
The industry faces significant challenges in the wake of COVID restrictions. There is a backlog of work to complete as a result of the deferral

Innovative Hot Tapping Hull Repair
On-station repairs to FPSO bilge keel and bilge plating while in production in harsh winter conditions.

Removal and Reinstatement of Pipe Stack
In the last year we have completed a unique world-first project which involved the destruct and reinstatement of a submerged cargo pump pipe stack while an FPSO was on-station and operational. Our